ESTIMATE
Tidewater Home Improvement LLC
Class B Contractor #2705172863
414 Worster Ave
Hampton, Virginia 23669
United States
(757) 551-6413
tidehomepro.com
Wanda Curliss
827 19th Pl
Newport News, Virginia
Project Name / Address
827 19th Pl, Newport News, Virginia
| Items | Quantity | Price |
Clean Out & Debris Removal Remove all debris from the crawlspace and haul offsite | 494 | $1.00 |
Water Management French drain with gravel channeling to existing sump pump; discharge line routed out; gravel at entrance inside & outside | 90 | $15.00 |
Wall Insulation Insulation against the crawlspace walls | 90 | $15.00 |
Rim Insulation R-19 Batt insulation around the perimeter block | 1 | $300.00 |
Vapor Barrier 20-mil Liner on the floor, cut & taped on site, taped to the wall insulation | 494 | $5.50 |
Dehumidifier AprilAire with condensation pump, drains into the sump bucket | 1 | $2,750.00 |
Electrical Outlet New dedicated outlet (breaker + GFI) for the dehumidifier | 1 | $600.00 |
Crawlspace Doors (2) Main door with Durock side + secondary door; mini-split line framed around | 2 | $430.00 |
Seal Vents All crawlspace vents sealed | 1 | $360.00 |
10% Discount | 1 | -$1,078.10 |
Subtotal:$9,702.90
Tax (6%):$0.00
Total:$9,702.90
Terms: Estimate valid for 30 days. Prices include all labor and materials as described.
Payment Schedule — 50 / 50
- Deposit: $4,851.45 (50%) due upon signing
- Final: $4,851.45 (50%) due upon completion
- Check is a preferred method. Credit card payments accepted via the link in your email.
Notes
- Jobsite will be left clean once completed.
- Contractor is not responsible for damage caused inside the home while working on the crawlspace.
- Structural work not included: joist repairs, beam replacement, subfloor sheet replacement, engineering, foundation modifications.
- Mold treatment not part of this scope. Sump pump kept as-is (existing pump). Mini-split line framed around only.
Warranty
- 12 months workmanship.
- 12 months drainage system.